Built
Beroun Schoolroom
- Location
- Beroun
- Year
- 2021
- Role
- Architect, tender and site
- Status
- Finished
The school had two classes in a corridor. The extension gives them proper rooms with a ceiling you can see the structure of, and a corridor wide enough to be used as a room in its own right.
We clad it in untreated larch and told the parents' committee it would look worse before it looked better. Four years on it is an even silver-grey and nobody has asked about paint since.